1. Sewer Furnish and install new underground sewer, tie into existing lateral as per plan (Owner will provide street permit) 6” SDR-35 PVC. a. Run sewer to building as per plan. Approx. 1ft from building. b. Furnish and install all cleanouts per plan. Precast concrete box G5 box WG-5C Cast iron Lid or Approved equal. c. Properly Backfill trenches. Compaction testing by others. Provided by owner. 2. Domestic Water Install new underground domestic water service as per Plan. Sub shall coordinate with Calwater. Water Meter furnish and install by Calwater. a. Cut into existing Water main. Install 2” inch C-900 PVC Water Line. b. The subcontractor shall be responsible for street saw cutting, trenching, backfilling and temporary patch back. c. Compaction testing by others. Provided by Owner. d. Water Meter: Provided by Calwater. Coordinate with water company. e. Run water line to the building as per plan Approx. 1’ from building. f. Furnish and install new backflow per plan. 3. Fire By others 4. Landscape a. No Meter. b. Tee off from domestic. 2” line. 3ft apart from water meter (Landscaper will provide backflow and guardian Enclosure)