This project involves disconnecting and removing the existing generators, prepping the sites and hooking up the new generators to the facilities electrical systems. The existing generator at City Hall/PD is currently non-operational and is disconnected inside a CMU enclosure located in the parking lot of the facility. The existing generator will be freed from its anchorage and placed on a flatbed truck with a crane, to be transported to the City Corporation Yard. The interior and west facing wall of the enclosure will be removed to allow for expansion of the area to fit the new generator. The west wall will be reconstructed at an offset, with a new steel access door leading to the parking lot. The existing concrete mat will be demolished, new underground conduit and electrical cabinets will be installed to feed wires to the new generator and make the connections, and the mat will be reconstructed within the new enclosure space.