The work involved under the terms of this contract document shall be full and complete installation of the facilities, as shown on the plans and as described in the construction specifications, to include but not be limited to: Schedule A – General Items; Mobilization; Temporary Traffic Control; Schedule B – Sewer Items; Cured-in-Place-Pipe (CIPP) Rehabilitation of a combined total of approximately 31,300 Linear Feet (LF) of 8”, 10”, and 12” Sanitary Sewer pipe. Trim two intruding laterals. Install One Point Repair; Reinstatement of 420 side- sewer laterals; Schedule C – Storm Items; CIPP Rehabilitation of a combined total of approximately 2,530 LF of 8”, 10”, and 12” diameter storm pipe. Reinstatement of six storm-sewer laterals; Trim two intruding laterals. Schedule B and C; Confirm the diameter and length of sewer and storm pipes to be CIPP Rehabbed; Confirm Storm and Sewer Lateral Location; Pre- and post- cleaning and Inspection; Bypass pumping