1. Mobilization/Demobilization: This lump sum bid item includes, but is not limited to, bonding, insurance, shop drawings, meetings, construction stakeout, preconstruction video, utility locating, staging, movement of equipment, site maintenance, replacement of any damaged property, and lawn. Payment will be scheduled as follows: fifty (50) percent upon issuance of Notice to Proceed and the balance upon completion of the project. Maximum allowable percentage for this bid item is 10% of the total bid. 2. Erosion and Sediment Controls: Work under this item includes all labor, equipment, tools, disposal costs, and incidentals necessary to complete the scope of work shown on the contract drawings and described in this specification. Payment for this item will be as a lump sum price. This work consists of furnish, setup, and removal of sediment and erosion control measures, including construction entrance, haul roads, silt fence, compost filter log, erosion control matting, etc. This item will not be measured but will be paid for at the contract lump sum price provided by the contractor on the bid form for Erosion & Sediment Control. Payment will be scheduled as follows: 50 (fifty) percent upon installation of controls and the balance upon completion of the project. 3. Clearing, Grubbing, and Site Restoration: This work consists of clearing the embankments, as required, of all woody vegetation for all areas within the work area. This work also consists of topsoiling, re-seeding and repairing any damages to the site to restore site conditions to pre-construction conditions. This item will not be measured, but will be paid for at the contract lump sum price provided by the contractor on the bid form for Clearing, Grubbing, and Restoration. 4. Tree Removal: This work consists of removing three trees from within the work area as specified on the Plans. This work also consists of tree disposal, stump grinding, and topsoiling and seeding for areas disturbed during tree removal activities. This item will be measured and paid for at the contract unit price for each provided by the contractor on the bid form for Tree Removal. 5. Dewatering: This work consists of furnishing all materials, installation, and operation of the dewatering systems in order to dewater the work area for construction operations. This item will not be measured but will be paid for at the contract lump sum price provided by the contractor on the bid form for Dewatering.