1.1 The following details the current scopes of work captured in this RFP: Service Drive Relocation - includes construction of a new asphalt drive connecting the Zoo’s east parking area to existing access drive adjacent to the gondola site, plaza and pedestrian bridge. The Contractor is to include all materials labor and equipment to complete all work shown. We anticipate that the drive will be completed in two phases: 1. Partially complete service drive through installation of the first lift of asphalt, allowing the drive to be used as the main access to the east gondola station and tower foundations; as well as emergency access to the river for City of Columbia Fire Department rescue operations. 2. Upon completion of the gondola installation and associated sitework and building construction is complete, the final lift of asphalt can be placed. B. Gondola Related Construction 1. Installation of gondola stations, towers, rigging, and cars will be completed by LeitnerPoma under a separate contract. 2. The selected contractor will provide all foundations for the tower and station structures, tree removal, grading, paving, underground utilities, landscaping, bathroom and ticket buildings, control buildings, queuing shelters, fencing, etc.