A. HVAC System Installation: • Install HVAC units to heat and cool the bathroom and front work area. • Explore cost-saving options (e.g., mini-split systems or zoned heating and cooling). B. Plumbing (Septic to Sewer Conversion): • Convert the building’s outdated septic system to Spartanburg Water’s sewer system. • Coordinate with Spartanburg Water for the connection, located behind the property near the creek. C. Electrical System Upgrades: • Install brighter lighting in garage bays. • Ensure sufficient lighting in all work areas for employee tasks. • Install new electrical outlets throughout the building, focusing on the garage bays. • Install exterior outlets and floodlights. • Replace the outdated fuse box and upgrade to 220V if required. • Install wiring for internet (likely through Spectrum). • Coordinate with Lockhart Power for any electrical requirements. D. Motorized Gate Installation: • Install a motorized gate with key code access for secure entry to the facility