HIGHWAY: SH 6, ETC LENGTH: 289.725 MI EST.COST: 17,680,635.55 COUNTY CONTROL LIMITS FROM HIGHWAY PROJECT LIMITS TO ------------------------------------------------------------------------------ EASTLAND 0007-04-136 US 183 IN CISCO, E. SH 6 C 7-4-136 AMERMAN ST. IN EASTLAND LENGTH: 9.740 MILES STEPHENS 0011-07-056 SHACKELFORD C/L US 180 C 11-7-56 W. SIDE OF US 180 BRIDGE STEPHENS 0011-09-076 FM 287 US 180 C 11-9-76 .132 MI E OF SH 67 LENGTH: 1.754 MILES STEPHENS 0011-12-007 US 180, W. OF CADDO SL 252 C 11-12-7 US 180, E. OF CADDO LENGTH: 1.512 MILES BROWN 0054-06-110 BANGS WEST CITY LIMITS US 67 C 54-6-110 COLEMAN C/L LENGTH: 3.752 MILES COLEMAN 0078-02-022 RUNNELS C/L US 67 C 78-2-22 CR 368 LENGTH: 6.353 MILES COLEMAN 0078-03-062 CR 368 US 67 C 78-3-62 .8 MI E OF FM 503 LENGTH: 4.711 MILES MCCULLOCH 0099-03-024 COLEMAN C/L.