• Preconstruction Services • Development of a GMP • Demolition, as required. • Renovation and new construction of buildings and site. • All permits, bonds, insurance, and other requirements as specified and as required for the project. • Largo Tibet Swing Site Renovations – This first phase of the project involves the renovation of the school identified as the Largo Tibet Swing Site to prepare a temporary home for the staff and students of Georgetown K-8. The renovations of Largo Tibet Swing will occur during the 2024- 2025 school year (while unoccupied) and be ready to receive the students and staff of Georgetown K-8 for the 2025-2026 school year. Renovations include window replacement, HVAC, finishes, and site modifications. The architect for the Swing Site project is, Barnard Architects LLC. • Georgetown K-8 Renovations – This second phase of the project involves the relocation of Georgetown K-8 School to and from the Largo Tibet Swing Site and a full renovation of Georgetown K-8 during the 2025-2026 school year (while unoccupied). The renovations include the entire campus which includes a new larger gymnasium, window replacement, interior finishing, bathroom renovations, roof replacement, ceiling and floor replacement, electrical improvements, paving and sidewalk replacement, and storm water improvements. Architect for the Georgetown K-8 project is, Cogdell Mendrala, Architects.