Bids shall assume that the vendor will provide the materials and labor to design, furnish, install and terminate all connections per the requirements listed below. • The fiber installation must include all appropriate permitting, locates, hand holes, grounding rods, markers, conduit, and rack mount fiber termination equipment. • The fiber must be single-mode and capable of running a minimum of 10 Gigabit, full duplex Ethernet speeds, given all distances specified in this RFB. • All fiber terminations must be LC/UPC connections. • All materials and equipment supplied to the City of Euless must be new and unused. • All fiber must be buried and installed in buried fiber conduit. • Fiber cannot be direct burial. • Fiber cannot be aerial. • All hand holes must be rated for occasional traffic. • All hand holes must contain 100 feet of additional fiber for each line. • All paved roads and existing utilities must be crossed via directional bore. • The contracted firm(s) shall follow an approved traffic control plan at all times for the duration of the project. • The contracted firm(s) shall provide detailed as-built plans to the Euless Information Services Department in AutoCAD format.