OFFICES (2,100 SQ FT): • Paint all existing ceiling grid then install new ceiling tiles • Install LVT flooring throughout the office areas including new cove base • Clean and paint all surfaces including doors and trim • Install a backsplash of FRP or stainless behind the handwashing trough • Build a 5’ wall with a 3’ door in the front hallway for sound purposes SHOP (11,900 SQ FT): • Clean entire area. This will have to be done with rags, cleaners, and wire brushes (vinyl coating on insulation prevents pressure washing) • Paint entire ceiling area with two (2) coats of dryfall paint • Clean all interior walls and roll- up doors and paint with two (2) coats of paint. (Approximately 13,440 SQ FT) MENS RESTROOM: • New commercial half-moon floor activated lavatory • New toilet and urinal • Change out bath partitions • New ceiling tiles and flat panel lights • Resurface ceramic tile floors • Repaint all walls and trim • Rework all dressing areas and showers