Paving shall include the radius at the intersection(s) Project is going to consist of 2” mill/planning and 2” overlay with a 2% slope from the center of the roadway, to match existing concrete gutter. Asphalt paving will have a Prime Coat and pave Type D HMA Price will include one-time mobilization Traffic control will be required with the proper signage throughout the project limits, and detouring traffic as needed while construction work is being performed. Contractor shall haul off millings to a location designated by a city representative. The contractor is responsible for cleaning up all project materials, and parking equipment in a safe location at the end of each day. The roadway shall be opened to traffic at the end of each working day.