The Project includes the following Work: construction of new effluent pump station; ATAD complex; biofilter; grit collector, scum pump station; anaerobic/anoxic selector basin; floating mixers; recycle pump; sidestream pump station; RV dump station; debris drying bed; chemical feed systems and storage; thickening and dewatering equipment; sludge mixing; sludge storage tank improvements; pumps; blowers; generators; sampler; modifications to Pump & Control Building, Administration Building, Aerated Grit Removal, Equalization Basins, Scum Pump Station; Final Clarifier and Garage Building; Sludge Storage Complex, Biosolids Processing Building, ATAD, Exhaust Air Bed, Sludge Drying Bed, Storage Building; equipment demolition; tank cleaning and content removal; tree removal, site grading, site lighting improvements, erosion control, painting, valves, piping, improvements including paving, plumbing, HVAC, and electrical, instrumentation & controls, and upgrades to the SCADA system. The anticipated substantial completion date is December 15, 2026, and final completion date is June 30, 2027.