1) TIA Project PI# 0018685 Approximately 16.2 miles of a combination of asphalt widening and resurfacing on Old Buckeye Road. More specifically widen 4.6 miles of the Buckeye Road, 2’ on each side, with 19mm asphalt @ 440lbs per SY where delineated and resurface complete 16.2 miles of roadway with 12.5mm asphalt @ 220 lbs. per SY beginning at intersection of Big Creek bridge and ending at Hwy 57. • Approximately 2375 tons of 19 mm asphalt • Approximately 25,090 tons of 12.5 mm asphalt • 5” Center and edge line striping. Edge line striping should be one and a half feet off edge of pavement. 2) Approximately 0.60 miles of asphalt resurfacing on Marsh Lane with 9.5mm asphalt @165 lbs. per SY beginning at intersection of Hwy 19 and ending at dead end. • Pavement width is 20 feet • Approximately 581 tons of 9.5 mm asphalt • No striping 3) Approximately 0.93 miles of asphalt resurfacing on James Currie Road with 9.5mm asphalt @ 165lbs. per SY beginning at intersection of Hwy 19 and ending at the end of pavement...