1. Replace existing light switches, switch covers, outlets, outlet covers, and thermostats. Map breakers. 2. Remove all existing lighting. Provide and install new LED grow lights and LED shop lights. All new lighting shall be hardwired. a. Greenhouse complex currently has fluorescent lighting. Bay 6 has 6 plug-in style LED grow lights installed below fluorescent lighting. Hardwire these LED grow lights and reinstall after removing the fluorescent lighting. 3. Correct electrical issue in Bay 6 and Bay 12. Remove cables and outlets to correct electrical violation. 4. Materials and labor shall be warrantied for 1 year unless otherwise noted. 5. Greenhouses are currently in use. No bay shall be without power for more than 72 hours at a time.