0 Division 2010 - Earthwork, Subgrade, and Subbase 0 0 1 2010-108-D-3 Topsoil, Off-site 14.00 CY 2 2010-108-E-0 Excavation, Class 10 270.00 CY 3 2010-108-J-0 Subbase, Granular Subbase - Gr 12a (Granular Subbase Pile) 475.00 TON 0 0 0.00 0 Sub Total 0 Division 3010 - Trench Excavation and Backfill 0.00 0 4 3010-108-B-0 Rock Excavation 276.00 CY 5 3010-108-D-0 Replacement of Unsuitable Backfill Material, Gr 32, (Modified Subbase Pile) 1458.00 TON 6 3010-108-G-0 Class I, Bedding Material, 1" Commercial Clean Stone 200.00 TON 7 3010-108-L-0 Rigid Insulation Board 64.00 SF 8 3010-108-M-0 Pipe Insulation Wrap 10.00 LF 0 0 0.00 0 Sub Total 0 Division 4010 - Sanitary Sewers 0.00 0 9 4010-108-A-1 Sanitary Sewer Gravity Main, Trenched, 8" PVC SDR26 280.00 LF 10 4010-108-E-1 Sanitary Sewer Service Stub, Trenched, 4" PVC SDR26 106.00 LF 11 4010-108-I-1 Double Sweep Cleanout 4.00 EA 12 4010-108-L-0 Sanitary Sewer Abandonment, Fill and Plug 0.25 CY 13 4010-108-M-1 Sanitary Sewer Lateral Wye Connection, DIP Wye, 8x4 4.00 EA 0 0 0.00 0 Sub Total 0 Division 5010 - Pipe and Fittings 0.00 0 14 5010-108-A-1 Water Main, Trenched, DIP, 8" 35.00 LF 15 5010-108-C-1 Fittings, DI Bend, 45 Deg, 8" 2.00 EA 16 5010-108-E-1 Water Service Stubs, Pipe, Copper, 3/4" 35.00 LF 17 5010-108-E-2 Water Service Stubs, Corporation, 3/4" 1.00 EA 18 5010-108-H-0 Water Main Removal, 8" 76.00 LF 0 0 0.00 0 Sub Total 0 Division 5020 - Valves, Fire Hydrants, and Appurtenances 0.00 0 19 5020-108-A-0 Valve, Gate, 8" 1.00 EA