Demolition, removal, and abandonment of existing horizontal water well, underground water supply lines, water storage tank and valves, and decommissioning of forest access roadways. Construction of building site pad, retaining wall, gravel access roadway, and prefabricated utility building. Installation of new vertical water well, water storage tank, power supply, electrical, telemetry, controls, and mechanical systems. Remove and replace storm water roadway culverts to reduce conflicts with new water system alignment, and complete asphalt roadway patch repairs. Install new waterlines (approximately 3,400 linear feet), valves, and supporting components for new water supply distribution system. Restore, stabilize, and mulch disturbed soil areas.