The project includes: • Construction of 4,114 linear feet of new 30-inch and 442 linear feet of new 24-inch transmission main along Molalla Avenue, including connections to the Mountainview Pump Station and existing transmission main piping (at the intersection of Molalla Avenue and Beavercreek Road). • Construction of 3,966 linear feet of replacement 8-inch and 443 linear feet of replacement 6-inch distribution main (along Molalla Avenue) including tie-ins at termination and at intersections from Holmes Lane to Beavercreek Road. • Replacement of 31 existing water services • Replacement of fire hydrant assemblies and addition of new fire hydrant assemblies • Abandonment of 7,081 linear feet of 6-, 8- and 16-inch water main. • Temporary and permanent pavement repair, as indicated on the Drawings. • Temporary control of traffic needed to complete the Work while protecting the safety of the traveling public. • Perform additional and incidental Work, as called for by the Specifications and Drawings.