The Contractor shall provide equipment and installation of data drops to allow for the expansion of Wi-Fi accessibility to the Chula Vista Facility. Provide and install five (5) new cable drops (CAT-6A) in the following rooms: Room # Name 224 Hobby Shop WiFi 237 Chill Room 215 Kitchen Office Outside Office Hobby Shop Building A Outdoor AP - CHU-AOUT-VA All cabling will be completed in a neat and conscientious manner adhering to all provided standards and industry best installation practices. All penetrations through fire rated walls/floors shall be fire stopped using appropriate UL listed sealant/putty to bring wall rating back to code each day. Cable runs should be closest to the nearest intermediate distribution frame (IDF). Workmanship/Guarantee The Contractor shall conform to all applicable city, county, state and federal laws, or ordinances, regulations, guidelines, pamphlets, circulation letters, or any other applicable directive in the performance of work under this Contract. This includes, but is not limited to Title 17 and Title 22 of the California Code of Regulations. The State shall inspect work performed by the Contractor after completion.