1. Design Phase: a. Review 100% CD design documents for constructability and commission ability b. Develop Commissioning Plans and checklists c. Develop Commissioning Specifications 2. Construction Phase: a. Review contractors’ submittals b. Monthly site commissioning meeting, field walk through and reports c. Functional Performance Testing d. Integrated System Testing e. Acceptance Tests f. Commissioning Reports g. Commissioning Kick-off meeting for Cx Team h. Track Issues and Resolutions i. Verify Training j. Develop Systems Manual (system-level operation) k. Review O&M Manuals 1. Systems to be Commissioned (as applicable): a. Hydronic Pumps b. Hydronic Piping c. Copper Fin Boilers d. Water Treatment e. Breeching, Chimney, and Stacks f. Air-Cooled Water Chillers g. RTU’s h. Power Ventilators i. Central-Station Air Handlers j. VAV Boxes k. Fire and smoke dampers l. Smoke Evacuation, Smoke Purge systems m. Integrated Functions of EMS Systems, sequences of operations. Verify related safeties, alarms and interfaces.