Completion of K9 training facility to include: Thermal insulation and moisture protection, spray foam insulation, all roof and walls, 5-3ft x 6.8ft interior doors and 3-metal exterior doors and 5- (3x4) windows in office area, including frame work and hardware. Install/order metal fabrication for floor drains/grates. Install all plumbing to include labor and material for bathtub and shower enclosures, sinks, bathroom fixtures and fittings. Install/order A/C pads and HVAC equipment to be installed into offices, bathroom and equipment and storage areas, all electrical with 31-2x4 LED, 37 single switch, 3 exterior lights, 1 can/fan combo, 1 exhaust fan, 4 GFI outlets, 4 3-way, 1-100 AMP panel, 1-48-gal electrical water heater. Install a septic grinder pump station to include plumbing to the existing septic. Contractor will be responsible for all project clean up and providing dumpsters and temporary portable toilets. Complete all framing including labor and materials, finish any carpentry, gypsum board, interior painting.