Work under this contract consists of sealing cracks from edge of pavement to edge of pavement, all turn lanes, gore areas and to the back of radius on side roads, mill & inlay various areas, thermos restriping, and RPM installation on SR 7 from MP 4.30 to MP 18.31 in Houston County and from MP 0.00 to MP 11.51 in Peach County. The contractor shall furnish all labor, materials, equipment, means of transportation, traffic control and incidentals necessary to perform work. This contract shall be bid per line item. Any damage to signs, pipes, culverts, drains, bridges, or any concrete structure that occurs during construction shall be repaired or replaced at no additional cost to the department. This work also includes cleaning, removing dirt, grass, and other debris from cracks and asphalt joints within the project limits, and filling with a polymer/ modified asphalt rubber type S from edge of pavement to edge of pavement. All travel lanes, left turn lanes, right turn lanes, center turn lanes, shoulders (varying widths), gore areas and side roads to the back of the radius within the limits shall be crack sealed.