The existing water main is cast iron pipe (CIP) and asbestos concrete pipe (ACP), which was installed up to 105 years ago and is being replaced with polyvinyl chloride (PVC) to minimize impacts and costs associated with breaks. The street reconstruction is necessary because the existing street section has deteriorated significantly and has exceeded its life expectancy. Reconstruction will include asphalt pavement, gravel base, curb and gutter, storm sewer inlets and leads, sanitary sewer spot repairs, driveway approaches, and sidewalk replacement. The project will be funded by a combination of City Funds (Wastewater Utility, Water Utility, Storm Sewer Utility, Street Light Utility and Infrastructure Sales Tax) and Special Assessments to the benefiting properties. Assessments will be applied per City policy.