Summary of Work – Lexington Blvd The scope of work for the above project includes removal of existing concrete pavement, existing curb, existing driveways, existing pedestrian ramps, existing signs, existing inlets, storm sewer pipes, manholes and pavement markings. The scope includes proposed concrete curb & roadway reconstruction. The proposed roadway section includes an 8” concrete pavement and 8” lime stabilized subgrade. The proposed intersection section includes 8” high early strength concrete and 8” cement stabilized sand. The scope includes the installation of curb inlets, area inlets, manholes & reinforced concrete pipes. The scope includes the installation of pedestrian ramps, sidewalks. The scope also includes the installation of vivid detections, pedestrian signals & poles at Bridgewater/Birchstone. Traffic Control, Permanent Signing and Striping, and Storm Water Pollution Prevention is also included as part of the scope for this project. Contractor to ensure he or she is familiar with the Utility Summary Package included In the Project Manual. The Utility Summary Package includes information on contact personnel regarding various utilities to be remain. Summary of Work – US 90A @ SH 6 Scope of work for this project include restriping the northbound lane configuration to have 3 dedicated left turn lanes and 1 through lane.