PHASE 2 WATER MAIN REPLACEMENT This project is generally described as trenchless and trenched water main construction: Along N Park St, N Orchard St, & N Claire St from W 8th St to W 9th St. Along W 9th St from N Park St to N Claire St. Along W 5th St from N West St to N Monroe St. Along N Madison St from W 5th St to W North St. This project also includes water service crossovers and side street connections along the routes. The improvements include approximately: 3,829 LF of trenchless 8” diameter water main; 61 water service connections; 12 fire hydrant assemblies; 26 valves; 213 LF of PVC storm sewer replacement; 215 SY of full depth HMA pavement patches; 295 SY of PCC sidewalk; 174 SY of PCC driveways; and 203 SY of granular driveways. Other associated improvements include, fittings, appurtenances, ADA compliant landings and ramps, traffic control, erosion control, surface restoration, and miscellaneous work necessary to complete the project. Commencement of Work Work on the improvement shall be commenced any time after a written Notice to Proceed is issued, no later than March 17, 2025, and shall be completed as stated below in the Completion of Work Section. The Notice to Proceed will be issued after the preconstruction conference