The project involves restoration of Pennypack Creek’s streambank. The north banks shall be cut back and stabilized using bio-engineering techniques and the south banks shall use a combination of geotextile soil wrap and brush mattresses due to the steeper slopes of the upland areas. Native plantings are included. The Contractor is responsible for all erosion control, demolition, grading, installation of stormwater improvements, plantings, trash/material removal, and local permitting. The Contractor shall provide all materials, equipment, tools, labor, and work, unless otherwise provided and shall be responsible for the complete supervision, performance and completion of all work in accordance with the drawings, specifications, special provisions and contract.