Site 1 - Police Evidence Room – Site 1 is located at 2415 University Ave, East Palo Alto, CA 94303 at the City Hall. Site 1 consists of comprehensive array of responsibilities aimed at enhancing the functionality and aesthetics of the City of EPA council chambers and police evidence room. This entails furnishing all necessary tools, equipment, facilities, labor force, transportation, and materials to execute interior tenant improvements. The scope of work encompasses a thorough modernization of the MEP (Mechanical, Electrical, and Plumbing) systems, ensuring they meet contemporary standards for efficiency and safety. Moreover, the contractor will oversee the transformation of the layout and furnishings within the designated areas to optimize spatial utilization and create a more conducive environment for council proceedings and police operations alike. A vital aspect of the project involves implementing upgrades to ensure full compliance with ADA (Americans with Disabilities Act) regulations, thereby advancing inclusivity and accessibility within the renovated spaces. A significant component of the endeavor involves the reconfiguration of the police evidence room, which will undergo a strategic transformation to serve as a versatile office and meeting room. Detailed Layout Plans have been provided to guide this process, ensuring a uniform transition and alignment with the project's objectives. Site 2 – Public Works Building – Site 2 is located at 1960 Tate St, East Palo Alto, CA 94303. The scope of the project contains a wide range of tasks essential for its completion. These tasks include, but are not limited to, the removal and replacement of the existing roof, rain gutters and downspouts, the removal and replacement of the current HVAC system including furnaces and condensing units, extend existing fence additional 4 ft Hight, installation 4 ft wide awnings, exterior doors, laminate flooring and interior painting. At Site 2, it is the contractor's responsibility to provide all required tools, equipment, facilities, labor, transportation, and materials for the installation of the new items mentioned above. Site 3 – Police Department Facility – Site 3 is located at 141 Demeter St, East Palo Alto, CA 94303. The scope of Site 3 encompasses an array of tasks crucial for its effective execution. These tasks encompass various activities such as installing new roofs at buildings A, B, and C as illustrated in Exhibit A, repairing damaged dry rot, installing new exterior siding, replacing plumbing fixtures, enhancing ADA access and parking facilities, replacing awning roofs, installation of a concrete patio pad, and conducting maintenance on the parking drainage system.