a. All personnel on site must pass a current background check in compliance to BSD standards and be badged at all times. b. Use of District Trimble (formerly known as ) eBuilder project management software is required. Training is provided by the district. c. This is a prevailing wage (BOLI) project. Certified payroll will be required on a weekly basis. d. Contractor is responsible for all field measurements. e. Work to include supplying, storing, and handling of all required materials. f. Work includes protection of neighboring finishes (i.e. gym floors) and replacement/repair of any damaged surfaces including but not limited to ceiling tiles, wall board, paint, insulation, concrete block, etc. Gym floor must be protected at ALL times for the duration of the project. g. Contractor shall provide all labor, materials, equipment, transportation, and other facilities and services as necessary and/or required to execute all the Work. h. All work areas shall be cleaned of any construction debris daily and disposed of off-site. General Contractor is responsible for material removal and disposal. Provide dust control and HVAC protection as required to protect the rest of the school from construction debris. Upon completion of the project, the General Contractor is to provide final cleaning of all work installed, replaced, or repaired.