This Contract provides for the improvement of W. Quinault Ave and Columbia Center Blvd Intersection. Improvements consist of providing a second left-turn lane for added turning capacity for eastbound traffic turning north onto Columbia Center Blvd. A dedicated through-lane and right-turn to be constructed for westbound traffic on Quinault Ave. An additional lane shall be constructed southbound on Columbia Center Blvd. that will turn into the Red Lion parking lot. The proposed work will require widening the intersection that will include new curb, gutter, sidewalk, traffic curbing, retaining walls, storm drainage, HMA overlay, new striping, signage and a new signal system (pre-purchased by the City). Also this proposed work will be in preparation for extending a 3rd lane for north and southbound traffic on Col. Center Blvd. south of the intersection.