Layout based on 50 Foot Candles (FC) average in the infield and 30 FC average in the outfield. • LED Sports Flood or equivalent • Voltage to be verified before fixtures are ordered. • Air Mesh Control System with Dynamic Scenes or equivalent (must be connected to 120v circuit) • Extension plates will be provided for mounting hardware and fixtures to the crossarms. • Furnish labor and equipment to remove and dispose of 112 existing fixtures. • Replace and haul off damaged pole with one 80’ MH concrete direct embedded pole with crossarms for 16 fixtures. • Repair any wiring to impacted poles as needed • Install and aim new fixtures. • Includes using existing poles, arms, branch circuits, and breakers, if possible. • Replace electronics in electrical room • Electronics must be controlled by PC-based computer. • Lighting shall be fully operational by February 28, 2025.