The scope of work includes furnishing all labor, materials, equipment, fixtures, and services required for the construction of a right-turn lane and a trailhead parking lot adjacent to Pioneer Parkway near Prescott, Arizona. The project consists of approximately 14,700 cubic yards of excavation, the construction of asphaltic concrete pavement (662 tons), the hauling, placement, and compaction of 591 cubic yards of crushed concrete surface course, and new signage, striping, and guardrail. Additional work includes the construction of a westbound right turn lane on Pioneer Parkway, erosion control measures, drainage infrastructure (including 314 linear feet of 18-inch HDPE storm drain pipe), and signage/striping installation. Other associated tasks involve the removal of existing pavement, guardrails, and striping, as well as the installation of a pre-fabricated vault toilet. All work is to be done in accordance with the plans, specifications, and contract documents.