The work consists of performing public improvements including: installation of approximately 7,000 linear feet of 10″ diameter polyvinyl chloride (PVC) water main, approximately 5,100 linear feet of 6″ diameter PVC sanitary sewer force main, approximately 110 linear feet of 48″ drainage gravity pipe, approximately 150 linear feet of 36″ drainage gravity pipe, and installation of a packed 8′ diameter dual pump, fiberglass packaged lift station and valve vault. Construction includes installation of all associated pipeline appurtenances, packaged lift station (purchased by others), connection of 10″ water main and 6″ sanitary sewer force main to existing respective water distribution and sanitary sewer collection systems, repair of damage to street incurred during installation, and all incidental and/or related work as necessary to provide a complete project.