1. Supply and install 60-foot Class 1 wood pole with 50-foot above ground. Pole to be located in the grass area behind the left rear corner of the building adjacent to the furnace room entry location. 2. Install three (3) antenna side arms at the top elevation of the pole. 3. Install three antennas, one (1) VHF, one (1) UHF and one (1) 700/800 omni antennas. 4. Install 1/2-inch LDF transmission line. 5. Install R56 compliant ground kits and ground down lead and ground rod. 6. Install two (2) ground bars, one (1) exterior, one (1) interior. 7. Provide three (3) 3-inch penetrations and conduit for cable entry into the furnace room adjacent to the radio room below grade. 8. Install three-hole cable entry port. 9. Install 3 (3) cable entry boots. 10. Install three (3) Polyphase RF surge protectors and bond to interior ground bar. 11. Supply and install three (3) RF antenna line jumpers to existing radio equipment, one existing VHF CDM 1250 control station and two (2) future radios . 12. Sweep test and document antenna systems.