The proposed project will involve installing approximately 10.23-miles of 12-inch, 10-inch, 8-inch, and 6-inch new water mains and associated appurtenances, including service stubs between the main and private property boundaries, along the Business 15 corridor between Blossburg and Mansfield. Trenching for water main installation is expected to take place primarily within the shoulder of existing roadways, which will be restored after installation. An approximately 10-foot by 25 foot building with flow/pressure regulating valving, master meter, and chlorine feed system will be installed at the interconnection with BMA’s water system. A 400,000-gallon water storage tank will be installed as part of the project. The tank will be approximately 50-feet in diameter, placed at elevation 1390.0 and approximately 40-feet in height. A re-chlorination system, consisting of a 10-foot by 16-foot chlorination, mixing, and valve control building will be installed at the tank. An 8-foot high chain link fence will be installed at the tank site. The proposed tank site is located immediately east of US-15 (future US-99) and immediately south of East Hill Road within Covington Township.