Remove the existing Cradlepoint 1700 router and 7-in-1 (or two) antennas. Install the Cradlepoint 1900 router with an 11-in-1 antenna. Ensure secure power connection and proper functioning of the new system, with inspection and testing by Mesa Fire and Medical Technical Services. Step-by-Step Work Outline Preparation and Safety Ensure all power sources and communication systems related to the Cradlepoint 1700 are safely powered down. Secure the work area, ensuring all ceiling panels and access points are cleared for safe removal and installation of hardware, ensuring no damage occurs to other equipment in the truck. Each truck is unique, so perform a briefing with the installation team, confirming adherence to safety and operational guidelines specific to the vehicle.