The scope of work is anticipated to include the demolition of current improvements in the way of the proposed work; replacement of existing flooring and wall finishes; installation of suspended ceilings, lighting, casework; renovation of existing restrooms, plumbing fixtures, and environmental control systems; modifications to air distribution and return systems; provision of power; modifications to the fire alarm system and fire sprinkler systems; installation of conduit and cabling for communications connectivity and security systems; installation of signage; and interior finishes. Existing improvements impacted by the work would be restored. The project may also require installing new or relocating existing medical equipment. The construction cost for the project has not yet been determined and may be executed through several phased, separate incremental projects. However, it is anticipated that the total construction cost may be between $2 to $3 million, depending on the agreed-upon scope of work.