Contract No. 1: General Construction: Work generally consists of providing and performing temporary bypass pumping; removal of existing wet well top section; furnishing and installing new wetwell top section with all required appurtenances; removal two (2) existing check valves; installation of two (2) Owner provided check valves; removal of two (2) plug valves; furnishing and installation of two (2) new plug valves; preparation and recoating of ductile iron process pipe; preparation and installation of a corrosion resistant lining system within wet well structure; removal of two (2) submersible pumps; furnishing and installing two (2) new submersible pumps; and all associated appurtenances and fittings as indicated in the Drawings and Specifications; restoration; signage, seeding; and incidentals. Contract No. 2: Electrical Construction: Work generally consists of removal of existing control panel; furnishing and installing one (1) new control panel; removal of existing magnetic flow meter; furnishing and installation of one (1) magnetic flow meter; furnishing and installation of one (1) new generator; and associated control systems, incidentals, and appurtenances as indicated in the Drawings and Specifications. Contract No. 3: Combined General and Electrical Construction: Work general consists of the Work described under Contract No. 1 - General Construction and Contract No. 2 - Electrical Construction.