This contract includes providing all labor, materials and equipment to complete the removal and replacement of the four existing culverts under Keen Road between Lake Drive and MacBride Drive in East Vincent Township, PA and all site improvement related to the culvert replacement work. Project includes replacement of the existing corrugated metal pipe with elliptical reinforced concrete pipe (RCP), replacement of existing guide rail on the south side of Keen Road and the removal of guide rail on the northern side of Keen Road, replacement of a 1 – 30 inch diameter corrugated metal pipe, 2- 15 inch diameter corrugated metal pipes and 1 – 18 diameter HDPE corrugate pipe with concrete reinforcement with 1 – 30 inch diameter HDPE pipe, 2- 15 inch diameter HDPE pipes and 1 – 18 diameter HDPE pipe, installation of a control structure and two headwalls, installation of grade control structures and bank stabilization measures and pavement replacement, placement of rip rap scour protection, restoration of all disturbed areas during construction and any and all work as shown on the plans titled, Keen Road Culvert Replacement Project prepared by Princeton Hydro, LLC last revised November 1, 2024. The elliptical culvert has a stream traveling through it. The contractor will be responsible for bypassing the flow while the culvert is being replaced. The eastern culverts collect runoff and are typically dry. The contractor is also responsible for any and all traffic control measures required during this project.