Work for this project consists of THE REHABILITATION OF 54 PIPE SEGMENTS AND 24 MANHOLES. The proposed work will consist of THE REHABILITATION OF PIPE SEGMENTS CONSISTING OF INSTALLING CIPP LINER INTO THE PIPE INTERIOR, INSTALLING UV CURED PIPE PATCHES, OR REMOVING AND REPLACING SANITARY SEWER PIPE IN KIND. TO COMPLETE CIPP LINER INSTALLATION, SEWER FLOW MAY NEED TO BE DIVERTED AROUND THE WORK AREA THROUGH BYPASS OPERATIONS AT SOME LOCATIONS. REHABILITATION OF MANHOLES CONSIST OF REPAIRING PVC T-LOCK LINER, APPLYING EPOXY COATING TO THE MANHOLE INTERIOR INCLUDING THE BENCH, WALL, CONE, AND CHIMNEY, INSTALLING CORROSION RESISTANT STRUCTURAL MANHOLE INSERTS, AND REMOVING AND REPLACING FRAME AND COVER, CHIMNEY, AND CONE. COMPLETE MANHOLE REMOVAL AND REPLACEMENT IS NOT NEEDED; THUS, BYPASS OPERATION IS NOT ANTICIPATED FOR MANHOLE REHABILITATION, together with associated work.