MOBILIZATION 1.000 LS BONDS AND INSURANCE 1.000 LS TRAFFIC CONTROL 1.000 LS REMOVAL & DISPOSAL OF EXISTING PAVEMENT 1,287.000 SY UNCLASSIFIED EXCAVATION 297.000 CY BORROW EXCAVATION 3,086.000 CY EXCAVATION FOR SHOULDER PAVING 815.000 STA HAULING OF EXCAVATED SHOULDER MATERIAL 815.000 STA MAINTENANCE STONE 109.000 TON HMA SHOULDER WIDENING COURSE 10,862.000 TON LIQUID ASPHALT BINDER PG64-22 1,354.000 TON FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 12,000.000 SY MILLING EXISTING ASPHALT PAVEMENT 2.0" 110,786.000 SY MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 2,245.000 SY MILLED-IN RUMBLE STRIP 23.000 MI HOT MIX ASPHALT SURFACE COURSE TYPE B 14,772.000 TON DRIVEWAY PAVING-SURFACE TYPE C 467.000 TON PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 808.000 SF 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 600.000 LF 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 900.000 LF 4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 28,500.000 LF 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 81,750.000 LF