Contractor will provide as following. A. Provide and install six (6) new 60 amp breakers from two existing panels. B. Provide trenching and boring as required for the six (6) dual port charger installations. 2 Dual chargers in P3 parking lot and 4 Dual chargers in P5 parking lot. C. Provide and install associated conduit and cabling in bored and trenching areas. D. Provide and install the six (6) pedestal bases. E. Provide all labor to install six (6) CP 6021 charger pedestal and twelve (12) total heads. F. Provide labor for startups, programing and training. G. Provided electrical permit for this work. H. Assist the with completing and submitting the necessary paperwork to receive availlable grants or funds from Oregon Department of Transportation (ODOT), Portland General Electric (PGE), or other sources. I. Remove and disposal of the three (3) existing chargers. J. The estimated schedule to complete the project will be 6 weeks from signed contract and issuance of the Notice to Proceed. K. Contractor will provide schedule of values and detailed schedule once the contract is signed.