Work for this Contract shall consist, but not be limited to, furnishing all supervision, personnel, labor, tools, equipment, transportation, storage, facility, services, and supplies required to construct the following: General Work including mobilization, establishment of site control points, abandonment of existing monitoring wells and piezometers, clearing and grubbing, fence removal and reinstallation, subgrade preparation, geosynthetic clay liner installation, HDPE geomembrane liner installation, geocomposite drainage layer installation, construction of leachate drainage trenches, HDPE leachate pipe installation, protective cover placement, sand drainage placement, stormwater sedimentation ponds, stormwater culverts, leachate collection pond, leachate lift station installation, forcemain installation, leachate return line installation, groundwater french drain installation, and installation of site access roads. Other work includes excavation and removal of soil not appropriate for liner construction, final grading, seeding of disturbed areas, and other work as shown on the Contract Drawings.