1. Conduit & Wiring systems to be installed for the following areas: 1. Playground 2. Basketball Court 3. Parking Lot 4. Tennis Court 5. Walkways 6. Note: The Baseball Fields are NOT included in this scope of work 2. This project was originally built with partial direct burial cable installed. 3. The installation shall include all trenching and/or saw-cutting for asphalt and concrete areas 4. Repair in kind all asphalt, concrete, grass/dirt areas that are affected bywork 5. Install new PVC Schedule 40 Conduit per NFPA 70, 2020 NEC, Table 300.5 for burial depths 6. Install wiring for underground conduit system, Type XHHW or equivalent, new branch circuits shall be rated at 208V single phase. 7. Please note, all wiring shall be approved for wet location installation. 8. Conduit & Wiring shall extend as shown on the Reference Drawing #7 to all lighting poles (locations). Work shall include proper grounding ofsystem. 9. Existing wiring and cable shall be removed as much as possible, including all direct burial cables 10. Contractor shall contact Call Before You Dig to coordinate underground work