1. Sitework preparation includes removal of a portion of existing asphalt parking lot and preloading the grade in preparation for a new concrete foundation and slab. Trenching and installation of electrical service, water, sewer, propane gas and internet fiber utilities. 2. Construction includes installation of a 2-bay pre-manufactured greenhouse comprised of an aluminum frame and polycarbonate wall and roof panels anchored to the concrete foundation. Systems installation includes sewer and water piping, electrical conduit and wire, interior and exterior lighting, mechanical equipment to heat both water and the building. Carpentry includes wall partition framing, door installation, and built-in counters with sinks, complete and ready for use