The Work of the Base Bid includes, but is not necessarily limited to, interior and exterior renovations; removal, and replacement of the roof system with a fully adhered PVC tapered system. Removal of all exterior windows on the first and second floors, replace with storefront system and all sliding doors at balconies will be removed and replaced with storefront and entry systems. Restore damaged area of concrete frame and recoat. Apply masonry water repellent to existing brick masonry. Exterior painting of all existing painted surfaces including railings and ladders. New aluminum balcony railings on front balconies. Change out existing glass sectional doors to new insulated sectional overhead doors, re-use existing tracks and motor drives. New interior finishes, new gyp. bd. walls and ceilings as well as new VCT floors upstairs. Cleaning of existing ductwork and HVAC units. New doors and hardware throughout interior. New lighting. Change out existing plumbing fixtures and new trim. New ceramic tile over existing wall tile in toilet rooms.