1. Furnish, install, operate, monitor, and maintain dewatering system of sufficient scope, size, and capacity to control hydrostatic pressures and to lower, control, remove, and dispose of ground water and permit excavation and construction to proceed on dry, stable subgrades. 2. The Contractor shall be responsible for the satisfactory performance of the system and for correcting any disturbance of natural bearing of soils or damage to structures caused by the dewatering system or by interruption of the continuous operation of the system as specified. 3. Continuously monitor and maintain dewatering operations to ensure erosion control, stability of excavations and constructed slopes, prevention of flooding in excavation, and prevention of damage to subgrades and permanent structures. Prevent surface water from entering excavations by grading, dikes, or other means. 4. Remove dewatering system once construction is complete and no damage will be caused to the installed pipe or structure from the well point system.