Fond du Lac County is requesting proposals from a qualified Contractor for construction of a concrete pickleball court at the Waupun County Park, 825 County Park Rd, Waupun, WI. Please refer to the design intent/production prints. Construction includes: • Install access road from the street to the new site. • Install erosion control fence around perimeter. • Strip topsoil off area (including landscape area) and stockpile. Undercut courts and move material to outside of courts as backfill. • Install drain tile pipe per plans on west side and 8" culvert under sidewalk to elevations shown. • Install 8 oz non-woven geotextile fabric in excavation, and new WI DOT 209 grade 1 material in 6" lifts and compact. All aggregate is to be placed with laser guided equipment. No red or blue tops or lath will be allowed inside the court and walk areas. • Laser grade and install 3/4" TB, install 2 layers (top layer to be 10 mil Stego Wrap) of 10 mil poly in opposite directions, overlap 12", tape joints over court areas, install pt cables and 6" concrete, concrete to be finished to a pan trowel just short of burnished. Note: PT slab to meet or exceed requirements for slope, planarity, and evenness per ASBA 2024 Construction and Maintenance Manual (p168 - 169) Any corrections required (either grinding or filling) to meet those specifications are the responsibility of the concrete contractor and are to be coordinated with the color coating contractor. Cover slab immediately and leave covered for two weeks. Pre-tension and tension cables per specs. • Install fence posts, concrete curbs, fence fabric, and concrete sidewalks. Curbs and walks to have a broom finish. After 30 day cure, shot blast courts, install, apply a diluted LM Bond Kote (1part LM to 5 parts water) 2 coats AR and 2 coats of color (inside to be dark green, exterior light green, and kitchen in grey). Mask, line prime & stripe court. • Install sidewalk from street. Landscape around perimeter and clean site. The design intent and the production prints represent the specifications that must be adhered to within this contract. There are no deviations or replacements allowed to this RFP.