2.00 PROJECT REQUIREMENTS 2.01 GENERAL The contractor will be required to provide a turn-key project of remodeling a total of six (6) men’s and women’s bathrooms on the first floor of the Henry County Administration Building. Contractor shall supply and include in their bid any additional items necessary to complete the project that is not included within this bid. This will be a turn-key project. The following equipment shall be purchased and installed at the expense of the contractor and shall be included in their total bid price: 2.02 SPECIFICATIONS WITH DETAILED INFORMATION Men’s employee restrooms (2): • Remove and replace tile on floor with Adessi 12x24 urban graphite tile • Remove and replace tile on walls with Castille 12x24 tauleto bianco tile • Remove and replace urinal with new proflo urinal and commodes (2) with new proflo wall mounted elongated commodes • Remove sink closest to bathroom stall and cap off water and drain lines • Remove and replace all bathroom partitions with Hadrian solid plastic floor mounted partitions color 239 Gray with headrail braced and aluminum hardware (standard), floor mounted partitions, fix and paint (white) ceiling where old partitions were as well as the rest of the ceiling, extend first stall that is located next to the sink that was removed to meet ADA requirements, and mount new stainless steel hand railings in the stall according to building code • Replace toilet paper holder with Georgia Pacific item# 56798; toilet paper holders in each stall (2) • Paint door frame on entry door white to match the ceiling • Replace mirror with new stainless steel frame mirror • We will keep the current sink, paper towel dispenser, and soap dispenser Women’s employee restrooms (2): • Remove and replace tile on floor with Adessi 12x24 urban graphite tile • Remove and replace tile on walls with Castille 12x24 tauleto bianco tile • Remove and replace commodes (2) with new proflo wall mounted elongated commodes • Remove sink closest to bathroom stall and cap off water and drain lines • Remove and replace all bathroom partitions with Hadrian solid plastic floor mounted partitions color 239 Gray with headrail braced and aluminum hardware (standard), fix and paint (white) ceiling where old partitions were as well as the rest of the ceiling, extend first stall that is located next to the sink that was removed to meet ADA requirements, and mount new stainless steel hand railings in the stall according to building code • Replace toilet paper holder with Georgia Pacific item# 56798; toilet paper holders in each stall (2) • Replace sanitary napkin disposal with new stainless steel Hospeco part# ND-1E sanitary napkin disposal • Paint door frame on entry door white to match the ceiling • Replace mirror with new stainless steel frame mirror • We will keep the current sink, paper towel dispenser, and soap dispenser Men’s public restroom (1): • Remove and replace tile on floor with Adessi 12x24 urban graphite tile • Remove and replace tile on walls with Castille 12x24 tauleto bianco tile • Remove and replace urinal with new proflo urinal and commodes (2) with new proflo wall mounted elongated commodes • Remove urinal closest to bathroom stall and cap off water and drain lines • Remove and replace all bathroom partitions with Hadrian solid plastic floor mounted partitions color 239 Gray with headrail braced and aluminum hardware (standard), floor mounted partitions, fix and paint (white) ceiling where old partitions were as well as the rest of the ceiling, extend first stall that is located next to the urinal that was removed to meet ADA requirements, and mount new stainless steel hand railings in the stall according to building code