Needed Service: Installation of drywall to ceilings and partial walls to include priming and painting in the Lake House on North Bass Island. Specifications/Scope of Work All material and labor to be supplied by Contractor: • Hang, mud/tape/sand, and texture each unit. 5/8” sheetrock on the ceilings, 1/2” sheetrock on the walls, unless otherwise noted on plans. Note: 5/8” sheetrock required on the interior of the unit party wall. Finish priming and painting of all walls and ceilings are required in areas where repairs have been made and in new areas of installation. Door replacement and all finish trim work around doors. Replace interior exterior storm doors (3) and entry doors (3). • Floors protected before mudding/taping begins. Floors cleaned during final clean-up of drywall phase. Trash to be hauled away by Contractor, NO DUMPSTER is available. • Excess drywall/material cleaned up and removed from site by contractor no trash facility on site. • All equipment and fuel to heat/dry mud, unless otherwise agreed upon with Owner. Propane/kerosene heaters are not permitted on the jobsite. CLEAN UP After completion of installation, the installation contractor shall remove all scraps, packaging, and rubbish caused by his work.