1. Removal and disposal of the existing wood deck, ramp, wood superstructure, and timber pile foundations at the fishing pier. 2. Removal and disposal of the existing floating pier connected to the fishing pier in its entirety. 3. Removal and disposal of the wood timber retaining wall adjacent to the parking lot access path to the pier and removal of the existing concrete stairs to the fishing pier. 4. Construction of a new wood deck, wood superstructure, floating pier, and ADA ramp including new timber pile foundations at the fishing pier. 5. Construction of new concrete stairs to the fishing pier including new steel pipe handrails. 6. Construction of a new concrete L-shaped abutment/wall at the intersection of the end of the fishing pier, the access ramp, and the new concrete stairs. 7. Construction of a new modular block retaining wall adjacent to the parking lot access path to the pier with safety railing. 8. Reconstruction and improvements to the access path from the parking lot to the pier. 9. Parking lot enhancements including two ADA H/C parking spots with appropriate striping and signage. 10. Repairs to the asphalt hiking trail. 11. Cleanup, finish grading, seed and mulch all disturbed areas.