The contractor will pump sewage from park holding tanks, pit toilets and ,waste water lift station pump pits periodically as requested and directed by the Agency. There are three — 1,000 gallon, five — 1,500 gallon, three — 2,000 gallon holding tanks and four— 1,500 gallon, three — 2,000 gallon pit toilets four lift station pump pits., three septic field primary tanks. The contractor's truck will arrive empty and sewage will be pumped from tank/pits until the truck's tank is full. All sewage will be taken to one of the two waste water lagoon facilities at the park area. The contractor will respond to notification of needed service within two (2) days. The contractor may be requested to assist outside normal business hours when a lift station is not operating. The contractor's vacuum tank pumping system shall be capable of properly removing sewage contained in these tanks and pits. The contractor shall dispose of sewage in accordance with all City, County, State and Federal regulations. The contractor shall possess and maintain all required licenses/permits and provide them upon request.